Monday, October 1, 2012

Ready for Deck!


The Stringers and floor supports are installed and the back two sections are sealed and i am now ready to start building the back deck.


Dry fitting everything



I used single stringers from floor to hull in order to add allot of forward aft strength to the boat.  This makes it much harder for the boat to flex along the rocker. 


Sheer Clamp installed and seat modified a bit to make it more comfortable to hike. 





I centerd the front two stringers to land behind the keel box figuring that's where the most pressure on the boat and having those stringers hit the back of the keel box directly will take pressure off the frame.  If they were offset it would cause the frame itself to take the pressure. 



No comments:

Post a Comment